Your drawings just got approved. Now what? How a villa fit-out unfolds

The stages of a villa fit-out in Dubai, from programme and setting out to MEP, joinery, snagging and handover day.

Aerial view of Terra Villa and its plot in Istria, Croatia

You have signed off the drawings, the budget is agreed and the approvals are in. The next question owners ask is the natural one: what actually happens now? A well-run villa fit-out follows a sequence that is logical, and understanding it helps you know what to expect each week, which decisions you will be asked for and why some things have to happen before others. This is the journey from approved drawings to handover day.

Stage 1: the programme

Before anyone picks up a tool, the programme is prepared. It lists every stage, every trade and every date, built backwards from the handover date you have agreed. It shows what must finish before the next thing can start, when long-lead items must arrive and when your decisions are needed.

A good programme is detailed enough to be useful and simple enough to follow. It is also a living document: it is reviewed regularly against what is really happening on site, and it is the basis for the updates you receive.

Stage 2: mobilisation and site setup

Before work begins, the site is prepared. Approvals are confirmed, the site is made secure, temporary power and water are arranged, and areas that are staying are protected. Floors, staircases, and any furniture left in the house are covered. Waste removal is organised and the rules for working hours and deliveries are agreed with the community.

Stage 3: setting out

Setting out is the process of marking the positions of walls, openings, levels and key elements on site, and checking them against the drawings. It happens before building starts, because mistakes found here cost nothing to correct, while mistakes found after the walls are built are expensive.

It is a stage owners rarely see, and one that experienced teams take very seriously.

Stage 4: demolition and preparation

Whatever is going is carefully removed, and whatever is staying is protected. Demolition often reveals the true condition of the villa, and this is when the survey is tested against reality. Surfaces are then prepared for new work: walls opened, slabs cleaned, services identified and isolated.

Stage 5: MEP first fix

MEP stands for mechanical, electrical and plumbing. The first fix is the installation of everything that will end up hidden behind walls, above ceilings and under floors: electrical conduits and cables, plumbing pipes, air conditioning ducts and pipework, and low-voltage services for data, audio and security.

This is the stage where coordination matters most. Pipes, ducts and cables compete for the same space, and what is hidden is expensive to move later. A careful team checks routes against each other and against the finished layout before anything is closed.

A dining room opening onto the garden at Lunna Villa, Istria
Lunna Villa · Istria, Croatia

Stage 6: walls, ceilings and waterproofing

With first fix complete and inspected, the building envelope is closed. Partitions go up, ceilings are fixed and plastering is applied. In wet areas such as bathrooms, balconies and terraces, waterproofing is installed and tested before any tiling begins. A leak behind a finished bathroom wall is one of the most painful problems a villa can have, so this step deserves time.

Stage 7: finishes and joinery

This is the stage most owners enjoy watching. Flooring is laid, tiles are fixed, joinery is built and fitted, kitchens and wardrobes arrive and paint begins to transform the rooms. The finishing stage depends on everything before it: if the walls are not straight or the levels are not right, the finishes will show it.

It is also when long-lead items arrive, which is why early ordering matters. A late delivery of stone or joinery can hold up several trades.

Stage 8: MEP second fix

Once surfaces are finished, the visible parts of the services go in: light fittings, switches and sockets, taps and sanitaryware, air conditioning outlets and controls, and smart home equipment where included. Everything is tested as it is installed.

Stage 9: testing and commissioning

Before the villa is declared ready, systems are tested as a whole. Does the air conditioning cool every room? Do the lighting scenes work as agreed? Is water pressure right at every outlet? Do the alarms and access controls function? Problems found at this stage are fixed before the snagging inspection.

Stage 10: snagging

Snagging is a detailed inspection of every room, with every defect recorded and corrected. It covers finishes, joinery, doors, windows, fittings and everything else you will touch or see. A thorough snagging process is one of the clearest signs of a well-run project. It reflects a simple principle: we do not accept work simply because it is finished. It has to be right.

Stage 11: final cleaning and handover

The villa is professionally cleaned, systems are demonstrated, and you receive keys, warranties, manuals and as-built drawings. A good handover includes a walk-through where you can ask questions and see how everything works. Where relevant, the developer's final inspection is completed and any deposit is reclaimed.

Handover day should be the easiest day of the project. If the previous ten stages have been done properly, it is.

A dining and living space at Terra Villa, Istria
Terra Villa · Istria, Croatia

What you will be asked to do along the way

  • Confirm finishes and fittings by the dates on the decision schedule.
  • Approve any changes you request, after seeing the cost and effect on the programme.
  • Review daily updates and raise questions early.
  • Visit the site at key points, or join a video walk-through.
  • Take part in the snagging and handover inspection.

Why the order matters

Every stage depends on the one before it. Skipping ahead, or rushing a stage that must be done properly, creates problems that appear later and cost more to fix. That is why a clear programme, careful inspection at each step and a single team responsible for the whole sequence make such a difference.

Planning a fit-out in the UAE or Croatia? Let's talk.

SS & Partners

Fitout and project management for villas and workplaces in the UAE and Croatia. One team from the first conversation to handover.

Talk to us about your project

Keep reading

(01) — Let's talk

+3.60 · Roof

Let's talk.

Every meaningful space begins with a conversation. Tell us about your home or workplace and we'll take it from there.